Design Progress Tracking

Derive objective progress data directly from design deliverables. Eliminate optimism bias and align CDE outputs to your work breakdown structure.

The challenge

Is your progress reporting only as reliable as your team leads' estimates?

Progress tracking shouldn't require chasing designers for subjective updates. But when your document naming conventions don't align to your work breakdown structure, there's no automated path from deliverables to progress. Your schedulers spend weeks gathering updates prone to optimism bias, while attempts at rules-based automation founder on metadata mismatches. The data feeding your project decisions is neither timely nor objective.

50%

of errors in building projects have their origin in the design stage

Get It Right Initiative (GIRI)

60%

of project status reports contain bias making self-reported progress data unreliable for decision-making

Snow, Keil & Wallace (2007)
How we solve it

From deliverables to progress data without manual intervention

1

Deliverable-to-WBS Mapping

Analyse each design deliverable and apply probabilistic matching to your work breakdown structure. Bridge the gap between CDE naming conventions and programme structures, creating the keywise pairing needed for meaningful progress roll-ups - even when metadata doesn't align perfectly.

2

Multi-Structure Alignment

Map deliverables to WBS, OBS, and CBS hierarchies simultaneously. Generate progress views that align to how your schedulers, design managers, and commercial teams each need to see the data - from a single source of truth.

3

Inductive Progress Reasoning

Derive progress from signals within deliverable metadata rather than waiting for manual updates. Query whether reviewers have been assigned, check dates have been set, verify approval workflows are complete, drawing answers from deliverable content to shine new light on work status.

4

Objective Progress Derivation

Calculate progress from what's actually been delivered, not what people say has been done. Remove optimism bias from reporting by grounding progress metrics in verifiable deliverable status rather than subjective estimates.

The impact

What this achieves

When progress data flows automatically from your CDE, your schedulers shift from data collectors to analysts. Increase reporting frequency without increasing workload - move from monthly to fortnightly cycles and catch slippage earlier. Make programme decisions based on objective evidence. And free your design teams to focus on designing, not filling in progress spreadsheets.

2,500files
×
15mins
×
£50/hr

Manual effort saved

625hrs

Manual cost saved

£31.25k

Want to learn more?

See Hoppa in action and learn how it can make the difference to your workflows.

Book a call
Category-leading technology

Our Ecosystem

Hoppa is your data refinery for effective information management at scale. From no-code configuration to SDK extensibility, we refine raw information into reliable, standards-aligned outputs you can count on.

Discover Ecosystem
Hoppa
Configure
Connect
Classify
Transmit

An open and modular enterprise ecosystem for outcome-driven solutions

Speak with our team

Tell us about your challenge and we'll identify a tightly scoped opportunity to prove Hoppa's value - with your own data, on your terms.

Book a call